GATE for PSU jobs: 6-month strategy
Which PSUs recruit through GATE, the cut-off logic, and a month-by-month plan.
How this guide works
Many PSUs (POWERGRID, NTPC, IOCL, BHEL, ONGC, GAIL, HPCL, BPCL and others) recruit engineers through GATE scores. This guide explains how shortlisting works, shows how GATE marks are scored with an example, and gives a 6-month plan.
1. How PSU shortlisting works
- You write GATE in your branch paper.
- The PSU publishes its own notice (usually JanβMar) listing accepted papers.
- You apply with your GATE registration number.
- They shortlist by GATE marks/score (cut-off varies by PSU, branch and category).
- Group discussion / group task + interview β final merit (GATE usually counts for most of it).
Each PSU decides its own cut-off and weightage every year β always read the official notice.
2. GATE marking (example)
| Question type | Marks | Wrong answer |
|---|---|---|
| MCQ (1 mark) | +1 | ββ |
| MCQ (2 marks) | +2 | ββ |
| MSQ / NAT | +1 / +2 | no negative marks |
You attempt 20 one-mark MCQs (16 right, 4 wrong) and 15 two-mark MCQs (11 right, 4 wrong): 16 β 4/3 + 22 β 8/3 = 34 marks. NAT questions have no negative marking β never leave them blank if you have a reasonable answer.
3. Where the marks are
| Part | Share |
|---|---|
| Core subjects | ~72% |
| Engineering mathematics | ~13% |
| General aptitude | ~15% |
General aptitude is 15 easy marks β don't skip it. Previous 10 years' papers are the best resource for everything.
4. The 6-month plan
| Month | Plan |
|---|---|
| 1β2 | Core subjects with the most weight, one at a time, with previous-year questions after each |
| 3 | Remaining core subjects + engineering maths |
| 4 | General aptitude + short revision notes for every subject |
| 5 | Topic tests + 1 full mock a week |
| 6 | 2 full mocks a week; revise weak areas only |
5. Practice β negative marking
You're 50:50 between two options on a 2-mark MCQ. Attempt it?
Show answer
Expected value = 0.5 Γ 2 β 0.5 Γ β = +0.67 β yes, attempt it. If you can't eliminate anything (1 in 4), expected value = 0.5 β 0.5 = 0 β skip.
6. After the result
Keep documents ready (marksheets, category/EWS certificates), track PSU notices weekly, and prepare for the interview: core fundamentals + your final-year project.
Further references
- Official GATE website of the organising IIT for the year
- Our core interview guides for Mechanical, EEE, Civil and ECE